2250kVA Data Centre Power
December 2008
On a frosty December morning 4 of the 13 large canopied generators for a UK data centre are in the last stages of production.
The roof-mounted remote radiators are the final addition before shipping.
Weighing approximately 32 tonnes each, all 13 generators can run in parallel at 75dB(A) @ 25m.
December 2008
On a frosty December morning 4 of the 13 large canopied generators for a UK data centre are in the last stages of production.
The roof-mounted remote radiators are the final addition before shipping.
Weighing approximately 32 tonnes each, all 13 generators can run in parallel at 75dB(A) @ 25m.
Engineering in 3D with further
Seats of Solidworks - December 2008
Two new CAD engineers are 'draughted' in to take the reins of new seats of Solidworks 2009.
ADE will soon be making the transition from 2D to 3D making Solidworks our primary engineering design software.
Seats of Solidworks - December 2008
Two new CAD engineers are 'draughted' in to take the reins of new seats of Solidworks 2009.
ADE will soon be making the transition from 2D to 3D making Solidworks our primary engineering design software.
Record order intake for ADE
November 2008
Recent sales developments bring record figures to the order books at ADE.
This month £15m worth of generators and associated project work are either in the design and development stage or already on their way to clients in the UK, US, Africa and Europe.
British Engineering shows no signs of decline at ADE.
.
November 2008
Recent sales developments bring record figures to the order books at ADE.
This month £15m worth of generators and associated project work are either in the design and development stage or already on their way to clients in the UK, US, Africa and Europe.
British Engineering shows no signs of decline at ADE.
.
Test House Facility Almost Complete
September 2008
ADE's new test house will be able to accommodate generators up to 2500kVA.
The silent viewing area and internet based camera monitoring will allow clients to witness the testing of their open generators in comfort, with the added advantage of still having their hearing intact after the event.
NB: Now with online witness testing (2010)
September 2008
ADE's new test house will be able to accommodate generators up to 2500kVA.
The silent viewing area and internet based camera monitoring will allow clients to witness the testing of their open generators in comfort, with the added advantage of still having their hearing intact after the event.
NB: Now with online witness testing (2010)
Yard Extension Completed
August 2009
Ongoing modifications to the yard area are now complete, including an extension of 1.2 acres to facilitate the simultaneous testing of up to 10 x 40' containerised generators.
August 2009
Ongoing modifications to the yard area are now complete, including an extension of 1.2 acres to facilitate the simultaneous testing of up to 10 x 40' containerised generators.
2500kVA Drop-over canopy
July 2008
A 2500kVA drop over canopy is shown complete and ready to leave ADE.
This huge 30 tonne one-off canopy, designed to the clients specification is now providing stand by power for Cable & Wireless.
July 2008
A 2500kVA drop over canopy is shown complete and ready to leave ADE.
This huge 30 tonne one-off canopy, designed to the clients specification is now providing stand by power for Cable & Wireless.
2250kVA Drop-over canopy
June 2008
This 2250kVA drop over canopy is one of four similar canopies ordered by Cummins Power Generation.
This Ultra-silenced generator is now on stand by duty in Welwyn Garden City.
June 2008
This 2250kVA drop over canopy is one of four similar canopies ordered by Cummins Power Generation.
This Ultra-silenced generator is now on stand by duty in Welwyn Garden City.
HMP Wetherby - Generator Sub Station
February 2008
The latest emergency stand by sub station leaves ADE for HMP Wetherby in Yorkshire.
Powered using a 900kVA Cummins generator, features include an integrated 18,000 litre fuel tank, switched distribution, HV/LV oil cooled transformer and internal / external lighting.
February 2008
The latest emergency stand by sub station leaves ADE for HMP Wetherby in Yorkshire.
Powered using a 900kVA Cummins generator, features include an integrated 18,000 litre fuel tank, switched distribution, HV/LV oil cooled transformer and internal / external lighting.
500kVA Custom Canopy
January 2008
This 75db(A) @ 1m custom designed canopy is now on stand by duty for a major UK construction firm.
January 2008
This 75db(A) @ 1m custom designed canopy is now on stand by duty for a major UK construction firm.
Careers at ADE
We currently have openings for Export Sales Managers, Technical Sales Managers and Solidworks Design Engineers.
Careers...
Latest News
Many projects have recently been completed including a 1000kVA generator for a police station in Surrey.
News Page...
Find us on 
Follow our tweets™ by visiting and registering with twitter.com.
Mailing List
Join our mailing list to receive advance news of our regular special offers on open and enclosed diesel generators.
Join...
© 2010 All rights reserved - Advanced Diesel Engineering Ltd -
Diesel Generators